We were contracted to expand the KENGEN LAN to incorporate the expanded Ngong phased II wind power generation units to enable SCADA functions. This involved Router installation, fiber optic cable installation, termination and commissioning.
We have just concluded installation and commissioning of then HVAC system to CAK regional offices (Nairobi HQs, Eldoret, Nakuru, Kisumu, Mombasa & Garissa) and are currently on the warranty and maintenance aspect of the contract.
The works included all structural works, equipment installation, 132 KV tower erections and conductor stringing, cabling, testing and commissioning.
We were contracted in the decommissioning of Towers and recovery of equipment from Essar (YU) sites and erecting and installing the same in Safaricom sites. We earlier on carried out configuration/programming works on Safaricom`s BTS power supply system. This involves setting up DC supply threshold levels so as to give the batteries a longer life span.
We have just concluded installation and are currently on testing &commissioning works for this project. This has involved equipment installation and Fiber optic cabling and terminations
We carried out civil tower foundation works as well as tower Steel structural works for 400KV power transmission line connecting the Kenyan and Ugandan power grids.