Setting up of additional telephone extension lines and supply and installation of Cisco switches and routers.
Performed radio network survey to establish line of sight, power budgeting and setting up WiMax connections and subsequently the Alvarion Integrated voice and data Wireless access system.
Consultancy on the design and implementation of the proposed Tatu City SCADA network and its integration to the existing KPLC network.
The works include all structural works, equipment installation, cabling, testing and commissioning. (Switch gear assemblies, Switch yard assemblies,Erection of insulators and fitting,Erection of grounding system)
We carried out installation and commissioning works for the KPLC Nairobi Region SCADA pilot project. This involved RTU (to pick SCADA signals) and radio installations (to enable communication, 66KV & 11KV power distribution network monitoring and remote control from the Regional Control Centre)
We designed and implemented a communication system for Kasarani 66/11KV substation that created a link to the Juja Regional Control Centre to enable SCADA. This also involved installation of 12 KM ADSS cable and termination at Kasarani 66/11KV and Ruaraka 132KV substation ends