Projects Page 3

COMPLETED & ongoing PROJECTS

Structured Cabling
| CLIENT: Kenya Airways |

Structured cabling works

Setting up of additional telephone extension lines and supply and installation of Cisco switches and routers.

WIMAX
| CLIENT: Kenya Data Networks |

Wireless network setup

Performed radio network survey to establish line of sight, power budgeting and setting up WiMax connections and subsequently the Alvarion Integrated voice and data Wireless access system.

SCADA
| CLIENT: GIBBS Africa |

SCADA design works

Consultancy on the design and implementation of the proposed Tatu City SCADA network and its integration to the existing KPLC network.

KAMBURU SUBSTATION
| CLIENT: African Equipment Engineering S.A |

Kamburu 132/33 KV substation

The works include all structural works, equipment installation, cabling, testing and commissioning. (Switch gear assemblies, Switch yard assemblies,Erection of insulators and fitting,Erection of grounding system)

CITY SQUARE SUBSTATION
| CLIENT: SinoHydro Ltd (China) |

City Square 66/33/11 KV GIS substations

We carried out installation and commissioning works for the KPLC Nairobi Region SCADA pilot project. This involved RTU (to pick SCADA signals) and radio installations (to enable communication, 66KV & 11KV power distribution network monitoring and remote control from the Regional Control Centre)

Kasarani
| CLIENT:Power Technics Ltd/Schneider Electric |

KPLC Communication - Kasarani Sub-station

We designed and implemented a communication system for Kasarani 66/11KV substation that created a link to the Juja Regional Control Centre to enable SCADA. This also involved installation of 12 KM ADSS cable and termination at Kasarani 66/11KV and Ruaraka 132KV substation ends